
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Jul 5 - Jul 10
For Your Every Summer RSVP, with Code: SUMMER15
Description
Donner Pass Train PosterDescription 14" x 22" poster Interpretive Copy Americas first transcontinental railroad was completed in 1869. The most difficult portion of the track to build was through the Sierra Nevada Mountains and over the 7,056 foot summit of Donner Pass. The 1,659 foot long Summit Tunnel, four additional tunnels, miles of snow sheds, and two Chinese Walls were also exceptionally challenging to build. Much of the same route carved out of the granite cliffs
Description
14" x 22" poster
Interpretive Copy
America’s first transcontinental railroad was completed in 1869. The most difficult portion of the track to build was through the Sierra-Nevada Mountains and over the 7,056-foot summit of Donner Pass. The 1,659-foot long Summit Tunnel, four additional tunnels, miles of snow sheds, and two Chinese Walls were also exceptionally challenging to build. Much of the same route carved out of the granite cliffs back then, is still in use today.
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy